Guide · Amarillo, TX
How long does it take to install a standby generator?
Updated November 2026
Most of the calendar time is waiting, not working. Here’s the usual order so you can plan ahead of storm season.
Short answer
The on-site installation itself is often one to two days. The full process, from site visit to a running system, commonly takes several weeks, because it includes sizing, a written proposal, permits, equipment delivery, gas or propane work and inspections. Equipment availability and utility or permit timing are the usual sources of delay.
The steps
- Site visit and sizing. Loads, panel, fuel supply and placement are checked.
- Written proposal. Generator, transfer switch, electrical and fuel scope, permits and price.
- Permits and ordering. Requirements depend on whether you’re inside city limits or in the county.
- Pad and placement. A level pad that meets the manufacturer’s clearances.
- Electrical and fuel connections. Transfer switch, wiring, gas piping or propane hookup.
- Inspection, start-up and walkthrough. The system is tested under load and you’re shown how it works.
What slows a job down
- Equipment backorders after major storms
- Gas meter upgrades by the utility
- Panel upgrades or long wire runs
- Permit and inspection scheduling
Want a real number for your standby generator project? We call back within one business day, usually sooner.
Call (806) 621-2688Leave a message with your name, number and project. We call back within one business day.
Best time to start
Demand jumps right after an outage. Starting before winter ice season or spring storm season usually means shorter waits.
Questions
Will my power be off during installation?
Usually for part of a day while the transfer switch is connected. You’ll be told when.
Where can the generator sit?
Outdoors on a level pad, with clearances from windows, doors and vents set by the manufacturer and local code. Placement is confirmed at the site visit.